The bridge cost €13m to build.
A cycleway between Dublin and Galway which crosses the River Shannon is close to being completed.
A bridge will be opened next month in Athlone as part of a €13m project.
The Irish Times reports it stretches 104 metres and took five months to be erected.
Once the project is completed, cyclists will be able to travel from the Spencer Dock in Dublin to Galway.