More than 20 turbines are planned for the site.
Significant works are underway at a wind farm in Offaly.
The Derrinlough Wind Farm project has just seen overhead line masts installed to connect the site to the transmission system.
The site is located on Clongawny and Drinagh bogs in Offaly and will consist of 21 turbines, each with a blode tip height of 185 metres.
The wind farm is expected to export a maximum of 105 megawatts when complete.
Uncertainty For Dealz workers In The Midlands
Nationwide School Bomb Threat Declared A Hoax By Gardaí
Laois Shopkeeper Details Frustration With Shoplifters
Offaly Woman Remembered As "Loving Mother" At Funeral
Nationwide Fuel Protests Called Off
Laois Plant Machinery Auction Showroom And Workshop Gets Planning Approval
Councillor Calls For Local Families To Be Prioritised In Midlands Social Housing Allocations
Niall Horan Gets Centra’s Biggest-Ever Chicken Fillet Roll Ahead Of 3Arena Gigs